You are currently browsing the archives for Thursday, November 23rd, 2006

Slow going

§ November 23rd, 2006 § Filed under Cartridge Rib Pullover § 4 Comments

Img_1621_1Here’s where I am at. After a burst of energy with the sleeve, this 312-stitch round knitting with the body is taking so long! I think I’m slowly resigning myself to the fact that I will not complete this pullover in time (then again, I’m leaving for home in just over two weeks and can’t really complain that time seems to be flying!!). I am trying to do at least ten rounds a day, but even if I walk to campus and back knitting, I rarely make that target.

So a little voice inside me is urging me to make peace with my frenzied fingers and instead take up something else for a change. Like socks. Or a hat. Or some mitts. But I do so want to try finishing this as soon as possible. (aside: does ASAP, in abbreviated caps, sound more urgent than the full form as soon as possible even though they mean the same thing? it does seem like that to me.)

Ah well. Back to the grind. While I’m at it, may I say that Elann and Knitpicks really do need to think about making their skeins larger than 100 yards? I’m running through them so quickly, and I’m going to have a bowl of spaghetti to weave in on the inside of this pullover after I’m done.

Finally, the MIL received the shawl, with a native American silver pin/brooch that I sent with it, a lovely design of swirling snakes. All is well. She loved it, it’s the right size and weight, and am I relieved!